BDBSA Project Metadata Detail

Survey/Project Number: 933          Total No. of Sites: 521
Survey/Project Name: GAB SPRINGS EXPANSION STUDY Borefield C -BHP Billiton 2005
Abstract: This project is a study of Borefield C Great Artesian Basin springs. Field investigations were carried out for a BHP expansion in September 2005. Several field observers were involved, primarily Darren Niejalke. For this project, the field observer has been entered as BHP employees. Wellfield C was not pursued (2009 EIS) as BHP deferred the Open Pit Expansion.
 
Start Date: 01/09/2005      End Date: 30/09/2005
Survey Type: Vegetation and Fauna
   
Study Area Description: GAB Springs in the Borefield C area of the Olympic Dam expansion.
Objectives
         Vegetation: Refer to Abstract.
         Fauna: Refer to Abstract.
Methodology
         Vegetation: *** No vegetation methodology recorded
         Fauna: *** No vertebrate methodology recorded

Data Distribution Rules: Public Dataset
Project Basis: Vegetation : Baseline Survey of flora and/or fauna - Standard Biol Survey of SA survey methodology not used.
Vegetation : Presence and absence method
Fauna : Baseline Survey of flora and/or fauna - Standard Biol Survey of SA survey methodology not used.
Fauna : Presence and absence method
Information Authority: BHP Billiton