Survey/Project Number: | 933 Total No. of Sites: 521 |
Survey/Project Name: | GAB SPRINGS EXPANSION STUDY Borefield C -BHP Billiton 2005 |
Abstract: | This project is a study of Borefield C Great Artesian Basin springs. Field investigations were carried out for a BHP expansion in September 2005. Several field observers were involved, primarily Darren Niejalke. For this project, the field observer has been entered as BHP employees. Wellfield C was not pursued (2009 EIS) as BHP deferred the Open Pit Expansion. |
Start Date: | 01/09/2005 End Date: 30/09/2005 |
Survey Type: | Vegetation and Fauna |
Study Area Description: | GAB Springs in the Borefield C area of the Olympic Dam expansion. |
Objectives | |||
Vegetation: | Refer to Abstract. | ||
Fauna: | Refer to Abstract. | ||
Methodology | |||
Vegetation: | *** No vegetation methodology recorded | ||
Fauna: | *** No vertebrate methodology recorded |
Data Distribution Rules: | Public Dataset |
Project Basis: |
Vegetation
:
Baseline Survey of flora and/or fauna - Standard Biol Survey of SA survey methodology not used.
Vegetation : Presence and absence method Fauna : Baseline Survey of flora and/or fauna - Standard Biol Survey of SA survey methodology not used. Fauna : Presence and absence method |
Information Authority: | BHP Billiton |